Home
About Us
Profile
Honor
Culture
Strength
Video
Products
Caigang activity house
Packing box
Fast LCL
Expansion box
Folding box
Space capsule
Integrated House
Light Steel Villa
Case
News
Company News
Industry News
Contact Us
Feedback
Language
中文版
ENGLISH
The difference between assembly house and activity board house
The materials used for the movable board house are mainly color steel plates, which are relatively simple and suitable for temporary construction on site. The main body of the light steel fabricated house is mainly made of light steel keel (light steel keel is actually cold-formed thin-walled steel), with light weight, environmental protection and energy saving, and suitable for living.
24
2022
/
08
Enterprises in Changle County take active actions to provide building materials urgently needed for hospital construction in Wuhan
At the integrated house production base of Weifang Zhongding Steel Structure Co., Ltd., several vehicles loaded with raw materials for building integrated houses slowly drove out and were transported to Wuhan Huoshen Mountain Hospital and Leishen Mountain Hospital.
Attention | CCTV News Network and other 6 mainstream media broadcast Changle at the same time
"Changle: 36000 m2 Box Houses Aid Wuhan Leishen Mountain and Other Hospitals"